Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | SHITONG |
Model Number : | floor deck |
Certification : | CE/ISO9001 |
Price : | Contact us for more information |
Payment Terms : | L/C,T/T |
Supply Ability : | 19 sets/month |
Delivery Time : | 59 working days |
floor deck roll metal forming floor tile making machine from china
Production Process:
Uncoiling→ Feeding material into machine →Roll forming → Auto cutting →Products receiving
Technical parameters:
Suitable Material | Material | GI, PPGI, PPGL |
Width | 1220mm | |
Thickness | 0.8-1.2 mm | |
Material of rollers | High grade 45# forged steel, surface hard chromium plating | |
Rows of rollers | 24 stations | |
Material of shafts | High grade 45# forged steel | |
Diameter of shafts | 90mm | |
Material of cutting blade | Cr12 Heat Treatment | |
Speed | 15-20 m/min | |
Side plate thickness | 20 mm | |
Chain size | 2 inch | |
Total power | 22 kw | |
Voltage | 380V 50HZ 3Phase | |
Appearance size (About) | 12000mm*1800mm*1700mm | |
Weight(About) | 13 tons | |
Length measurement | Encoder | |
Control mode | Delta PLC | |
Operating mode | Button +Delta Touch screen |
Manual Decoiler
Capacity | 5T |
Inner Diameter | 450-550mm |
Width | 1250mm |
Packing Method
Main machine is packaged with plastic film
Transportation
All machines need one 40 feet container to hold
Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment.
Delivery Time
Within 50 days after receiving deposit.
Warranty
Two years, and we will provide technical support for wholelife of the equipment.
If some parts of machine broken within 2 year, we will give customer the spare parts for free. (include chain, bearing, roller,oil pipe, counting wheel) If more than 2 year, maybe some spare parts need to be charged. If machine can not work well, we can teach them online until the machine is perfect. If you need, we can go to your place to assist you. But you need to provide the cost of the engineer.
floor decking tile roll making forming machine price
Q: How to maintain the machine?
A: add mechanical lubrication equipment to chain, bearing and
cutting slide every month. Add mechanical lubrication to the case
every half a year.
Q: Do you sell only standard machines?
A: No, most of our machines are built according to customers
specifications, using top brand name components.
Q:How many workers to operate the machine?
A:Only 1-2 workers.
Q: How to visit your company?
A:a.Fly to Beijing airport: By high speed train From Beijing Nan
Station to Cangzhou West Station(1 hour), then we can pick you up .
b.Fly to Shanghai Airport: By high speed train From Shanghai
Hongqiao to Cangzhou West station(4.5 hours), then we can pick you
up.
Q: What can you do if the machine broken?
A:Our machine's warranty period is 12months,if the broken parts
can't be repaired,we can send the new parts to replace the broken
parts for free,but you need pay the express cost yourself.if over
warranty period,we can for to solve the problems via
negotiation,and we supply the technical support for the whole life
of the equipment.
Q:How can I trust you that machines pasted testing running before
shipping?
A: 1) We record the testing video for your reference. Or,
2) Please visit company and test machine if convenient.
![]() |